Now
Between 26 and 29 April, the SES (Syndicat des Eaux du Sud Koerich) water utility will be conducting works on a major water main. Tests related to this work will begin on Monday, 23 March.
The water main supplying the Rattem reservoir will therefore be taken out of service for approximately 50 hours. To prevent any shortage of drinking water, this pipeline will be bypassed and supplied via the Niederkorn reservoir. Slight fluctuations in water pressure may occur during the transition.
At no time during the entire testing phase will there be a shortage of drinking water.
Thank you very much for your understanding
Audio playback of the page content is active.
Stop playback