Belvaux Road will be closed to traffic on Tuesday, September 2, 2025, from 7:00 AM to 4:00 PM due to crane assembly work. To ensure public safety during this construction, the City of Differdange will implement the following measures.
Belvaux Road will be blocked at two locations:
A detour will be established via Prince Jean Square and Pierre Martin Street.
The Post-Oberkorn bus stop will be temporarily relocated to the Prince Jean Square stop for the duration of the work.
Parking will be prohibited:
Pedestrians must use designated crossings:
The sidewalk will be blocked at the construction site and safety barriers will be installed.
Date: Tuesday, September 2, 2025
Hours: 7:00 AM to 4:00 PM